Project
Description
As part of the complete renovation of the heritage-listed bank building, an automated 24/7 customer safe deposit system was planned and installed in close coordination with Imhotec. The project faced several challenges, including structural restrictions due to heritage protection, static requirements for floors and walls, and limited space on the ground floor.
The 24/7 safe deposit system was completed in December 2022 and has been in operation since January 1, 2023.